Redesign
reduced overall production costs
The original design
of a steel pan used in a medical application was a three-piece, spot welded
assembly that cost $29.65. To increase the manufacturing efficiencies,
we moved the production from the press brake equipment to our Salvagnini
forming cell. We were able to consolidate three components into one complex
part that had twelve bends. The redesign eliminated several secondary
operations and reduced the overall production cost to $18.82, a 37% savings. |
|
 |
|