Our inspection process begins with our experienced setup personnel. With each process setup the part is first verified by the setup operator against the prescribed inspection instruction. Once the setup operator has a part believed to be within specification, the setup part is taken to the inspection area where a dedicated shift Inspector checks the part for setup approval. In process inspections are sampled through the run, and Final Inspection and a Visual Audit takes place once all operations are complete.